TECHNICAL GUIDE
Air Pump Pressure vs Flow
Read performance curves at the real system resistance, not free flow.
Select at the real operating point. Confirm voltage, flow or pressure, duty cycle, noise, media, temperature, life and interface before qualification.
Define the operating point
Use measured system conditions and record the setup so engineering and procurement evaluate the same requirement.
Read the performance curve
Use measured system conditions and record the setup so engineering and procurement evaluate the same requirement.
Verify integration constraints
Use measured system conditions and record the setup so engineering and procurement evaluate the same requirement.
Run a representative sample test
Use measured system conditions and record the setup so engineering and procurement evaluate the same requirement.
FAQ
What information should I send?
Application, voltage, flow/pressure, resistance, media, temperature, noise, duty cycle and annual volume.