TECHNICAL GUIDE

Solar Circulation Pump Design

Design for variable power, temperature, head loss and dry-run risk.

Direct answer

Select at the real operating point. Confirm voltage, flow or pressure, duty cycle, noise, media, temperature, life and interface before qualification.

1

Define the operating point

Use measured system conditions and record the setup so engineering and procurement evaluate the same requirement.

2

Read the performance curve

Use measured system conditions and record the setup so engineering and procurement evaluate the same requirement.

3

Verify integration constraints

Use measured system conditions and record the setup so engineering and procurement evaluate the same requirement.

4

Run a representative sample test

Use measured system conditions and record the setup so engineering and procurement evaluate the same requirement.

FAQ

What information should I send?

Application, voltage, flow/pressure, resistance, media, temperature, noise, duty cycle and annual volume.